Cycle-Works has recently installed 70 Josta 2-tier racks in a specially prepared room in the basement of Prospect House in London. The works were completed in a single day for the contractor Structuretone. This has been added to with the installation of a wheeling ramp to take bikes down a flight of stairs to the basement.