Cycle-Works have recently installed two Higher Solent shelters that cover 46 cycle parking spaces using the Josta 2-tier system at the Department of Statistics in the St Giles area of Oxford.
The shelter framework is painted in a distinctive Anthracite grey that matches the lockable gates to the courtyard area where the shelters are located.
In addition, the framework is treated with an anti-graffiti coating that will allow any unwelcome graffiti to be removed.
The installation was carried out over a two day period without any disruption to staff and students in the department.