Cycle-Works recently installed 96 Josta 2 tier racks in 2 rows of 48 spaces each at the new prestigious offices of BP at Bedfont Lakes near Staines. Cycle-Works worked closely with the contractor on the project ISG so that the racks were installed at the final stages of the build in the specially constructed bike compound.