2017 April

London Dock Phase 2 / Over 300 bike places installed

On April 13th, 2017, posted in: Uncategorized by Comments Off

We have finished installing phase 2 of the cycle parking at the prestigious London Dock E1. We were able to utilise the flexibility of the Josta 2-tier system to maximise the number of bike places. One section was angled at 45 degrees to the wall and had a wider centre distance so it could be..

read more