admin

London Dock Phase 2 / Over 300 bike places installed

On April 13th, 2017, posted in: Uncategorized by Comments Off

We have finished installing phase 2 of the cycle parking at the prestigious London Dock E1. We were able to utilise the flexibility of the Josta 2-tier system to maximise the number of bike places. One section was angled at 45 degrees to the wall and had a wider centre distance so it could be..

read more

Cycle-Works bridges the gap at Birchwood station

On March 30th, 2017, posted in: Uncategorized by Comments Off

Cycle-Works have been working with Warrington Borough Council to install new wheeling ramps over Birchwood station footbridge. The footbridge has been divided into two sections, with one for cyclists and the other for pedestrians. There are a total of four flights of stairs, with each staircase having two lengths of wheeling channel to cope with..

read more

Cycle-Works is at the Manchester Bike Expo

On March 18th, 2017, posted in: All News Items by Comments Off

Cycle-Works will be providing the bike parking for the 2017 Manchester Bike Expo. The event is on Saturday 18th until Sunday 19th March and running from 10:00am until 5:00pm daily. The event is located at EventCity, Urmston, Stretford, Manchester, M41 7TB. If your in the area over the weekend and into anything relating to 2..

read more

Cycle parking a Wapping success

On March 16th, 2017, posted in: Uncategorized by Comments Off

Cycle-Works have just completed the cycle parking for the prestigious new London Dock development, in the heart of London. This development is only a short walk or cycle ride from Tower Bridge and the City, and so it is expected that cycling will be a really popular way for residents to get around. Cycle-Works provided..

read more

Cyclists get more support in Portsmouth

On March 16th, 2017, posted in: Uncategorized by Comments Off

Many new bike stands have recently been installed around Portsmouth, providing over 70 more secure bike parking spaces. Cycle-works provided the modern, attractive racks, which incorporate the Portsmouth logo, a security bar and many locking points. They are made from 316 stainless steel to ensure a long life in the marine environment and are already..

read more

Cycle-Works are at the Sustainable Transport and Health Summit in Bristol

On February 23rd, 2017, posted in: All News Items by Comments Off

Cycle-Works are please to be attending the Sustainable Transport and Health Summit in Bristol on the 23rd and 24th of February. We believe a fundamental aspect of good sustainable transport is safe, secure and convenient bike parking. This in turn encourages more people to get on their bikes and increase overall health.

read more

Cycle-Works at the 2017 London Bike Show

On February 17th, 2017, posted in: Bike Stations, Cycling & Bike Parking News by Comments Off

Cycle-Works are pleased to be supplying the bike parking for the 2017 London Bike Show. Cycle-Works can be found on stand LB1803. Hope to see you there!

read more

UCLAN students get new cycle parking at Friargate, Preston

On October 21st, 2016, posted in: All News Items by Comments Off

Cycle-Works have recently completed the installation of two Higher Avon shelters at the new Friargate student accommodation for the University of Central Lancashire in Preston. In total there are nearly 70 cycle spaces using our high capacity Josta 2-tier cycle racks. Working closely with the main contractor, Eric Wright Construction, the installation was completed over..

read more

Cycle-Works new ‘VeloPark’ unveiled at Cycle City Leicester

On June 8th, 2016, posted in: All News Items by Comments Off

Cycle-Works are both pleased and excited to have unveiled the new ‘VeloPark’ concept at the Cycle City Active City Conference in Leicester on 18 – 20 May 2016. The VeloPark provides a cycle parking facility, by taking a typical car parking space of around 2.4m x 4.8m, separated from the road by using bespoke planters..

read more

University of Oxford, Statistics Department – working out that cycle parking stacks up with Cycle-Works

On February 25th, 2016, posted in: Uncategorized by Comments Off

Cycle-Works have recently installed two Higher Solent shelters that cover 46 cycle parking spaces using the Josta 2-tier system at the Department of Statistics in the St Giles area of Oxford. The shelter framework is painted in a distinctive Anthracite grey that matches the lockable gates to the courtyard area where the shelters are located...

read more