2017 March

Cycle-Works bridges the gap at Birchwood station

On March 30th, 2017, posted in: Uncategorized by Comments Off

Cycle-Works have been working with Warrington Borough Council to install new wheeling ramps over Birchwood station footbridge. The footbridge has been divided into two sections, with one for cyclists and the other for pedestrians. There are a total of four flights of stairs, with each staircase having two lengths of wheeling channel to cope with..

read more

Cycle-Works is at the Manchester Bike Expo

On March 18th, 2017, posted in: All News Items by Comments Off

Cycle-Works will be providing the bike parking for the 2017 Manchester Bike Expo. The event is on Saturday 18th until Sunday 19th March and running from 10:00am until 5:00pm daily. The event is located at EventCity, Urmston, Stretford, Manchester, M41 7TB. If your in the area over the weekend and into anything relating to 2..

read more

Cycle parking a Wapping success

On March 16th, 2017, posted in: Uncategorized by Comments Off

Cycle-Works have just completed the cycle parking for the prestigious new London Dock development, in the heart of London. This development is only a short walk or cycle ride from Tower Bridge and the City, and so it is expected that cycling will be a really popular way for residents to get around. Cycle-Works provided..

read more

Cyclists get more support in Portsmouth

On March 16th, 2017, posted in: Uncategorized by Comments Off

Many new bike stands have recently been installed around Portsmouth, providing over 70 more secure bike parking spaces. Cycle-works provided the modern, attractive racks, which incorporate the Portsmouth logo, a security bar and many locking points. They are made from 316 stainless steel to ensure a long life in the marine environment and are already..

read more